Installation of detection systems with optical and acoustic signaling
Tanks made from stainless steel
Production and delivery of two sumps DN 1000
Prefabrication and installation of steel structure of sheds
Production of tanks made from boiler steel
Erection and disassembly of temporary live steam pipeline
Steel structure of footbridges for pedestrians
Installation of systems for raw and treated sewage, biogas installation
Repairs of steam desuperheating installation, 6 and 13 bar
Cooling water installation along with installation of cooling towers
Production, installation and transport of steel structures and tanks
Disassembly – erection works of firefighting installations
Prefabrication of scrubbers 5 units, columns 3 units, receptacles 3 units, and stainless steel tank 1 unit
Modernization of biogas pipeline DN200
Production of platform for overhead crane basket
Steam installation DN 500 with support structures
Overhaul of 6 bar steam pipeline for deaerators
Prefabrication and installation of a shed as well as installation of pipelines and fittings
Installation, painting and insulation of demineralized water tank V=500m3
Welding of oil pipeline DN800
Phosphoric acid installation
Assembly of large-size components